2629504250
OHrev 000Trabajo 26710021 | REEMPLAZADO POR 2629504250ActivoActualizar hoyINSTALL FIBER OPTIC CONDUIT
Última actualización con Ohio 811: 10/23/2026, 5:07:50 AM
- AEPP1Sin conflicto
AEP OHIO - COLUMBUS (UTILIQUEST)
001electric
No Conflict - Underground facilities operated by this member are not in conflict based on information provided in the Excavation Request.
by Darrell . Cordle · 10/22/2026
- WCOPEsperando
CHARTER SPECTRUM (USIC)
communication
- ATSPEsperando
FIRST ENERGY FIBER/USIC
communication
- GTOPEsperando
FRONTIER COMM (FORMERLY VERIZON) (USIC)
communication
- ORPPSin conflicto
MARATHON PIPE LINE - HEATH
001gas
No Conflict - Underground facilities operated by this member are not in conflict based on information provided in the Excavation Request.
by Andrea Pendolino · 10/22/2026
- OH811Esperando
OUPSTECH - NO +RESPONSE REQUIRED
reclaimed water
BEGINNING AT THE INTERSECTION OF N SECTION LINE RD AND NORTON RD (40.429613, -83.114341). LOCATE SOUTH ALONG N SECTION LINE RD APPROXIMATELY 1,710 FEET TO 40.424949, -83.114769. LOCATE BOTH SIDES OF N SECTION LINE RD, INCLUDING THE ROADWAY AND 40 FEET BEYOND EACH EDGE OF PAVEMENT. INCLUDE ALL DRIVEWAY CROSSINGS WITHIN THIS SECTION. INCLUDE THE N SECTION LINE RD / NORTON RD INTERSECTION. THIS ROAD IS ON THE RADNOR / MARLBORO TOWNSHIP LINE; INCLUDE BOTH SIDES.
JOB 26710021. N SECTION LINE RD SECTION 1 OF 5. OHIO811 WORK DATE: 10/07/2026 23:59:59. BEGIN ON 10/08/2026 AFTER CHECKING POSITIVE RESPONSES. START BY 10/21/2026 23:59:59. RESPONSE SYNC PENDING.
- 2627806735Oct 8, 2026 – Oct 20, 2026