Volver a todos los tickets

2626005613

OHrev 000ActivoQuedan 10 días

INSTALL FIBER OPTIC

Última actualización con Ohio 811: 9/20/2026, 11:05:46 PM

Portal Ohio 811
Utilities miembro1/4 respondieron
  • CGPP

    COLUMBIA GAS OF OHIO-MARION (RECONN)

    001

    gas

    No Conflict - Underground facilities operated by this member are not in conflict based on information provided in the Excavation Request.

    by Jaryd Bowman ( Reconn DL Server ) · 9/19/2026

    Sin conflicto
  • GTOP

    FRONTIER COMM (FORMERLY VERIZON) (USIC)

    communication

    Esperando
  • MPC

    MARION WATER POLLUTION CONTROL-CITY OF

    sewer

    Esperando
  • OED

    OHIO EDISON - (USIC)

    electric

    Esperando
Descripción de la ubicación

LOCATE FROM THE INTERSECTION OF SR 739 AND LARUE PROSPECT RD: LOCATE 300 FT NORTHWEST ALONG SR 739 AND 400 FT NORTHEAST ALONG LARUE PROSPECT RD. INCLUDE THE ENTIRE INTERSECTION AND THE ENTIRE ROADWAY. MARK BOTH SIDES OF EACH ROAD AND EXTEND THE LOCATE AREA 40 FT BEYOND BOTH EDGES OF PAVEMENT FOR THE FULL DISTANCE DESCRIBED.

Ubicación
CalleSR 739
Calle transversalLARUE PROSPECT RD
CondadoMARION
Lugar / MunicipioGREEN CAMP TWP
EstadoOH
Fechas
Fecha válidaSeptember 22, 2026
Fecha de vencimientoOctober 1, 2026
Trabajo
Job number
Tipo de trabajoINSTALL FIBER OPTIC
ParaCHARTER / SPECTRUM
PorJA UNDERGROUND FACILITY LLC