2629602602
OHTrabajo 1603EActivoActualizar hoyINSTALL FIBER OPTIC CONDUIT
- CVNPEsperando
CABLEVISION LIGHTPATH LLC (STAKECENTER)
COMMUNICATION
- XUCPEsperando
EXCEL UTILITY CONTRACTORS (NLL)
COMMUNICATION
- GTOPEsperando
FRONTIER COMM (FORMERLY VERIZON) (USIC)
COMMUNICATION
- OEDEsperando
OHIO EDISON - (USIC)
ELECTRIC
- OH811Esperando
OUPSTECH - NO +RESPONSE REQUIRED
RECLAIMED WATER
- USSEsperando
U S SIGNAL COMPANY
COMMUNICATION
- VFNPEsperando
VERO FIBER NETWORKS /USIC
COMMUNICATION
FROM THE INTERSECTION OF SR 161 AND SR 38 / LOMBARD RD (GPS 40.112247, -83.390672), TRAVEL APPROXIMATELY 9,500 FT EAST ALONG SR 161, FOLLOWING THE ROAD, TO THE BEGINNING POINT (GPS 40.115738, -83.358608). LOCATE AND MARK CONTINUOUSLY FOR APPROXIMATELY 511 FT EAST ALONG THE SOUTH SIDE OF SR 161, FOLLOWING ALL CURVES IN THE ROAD, ENDING AT THE SR 161 / DEBOLT RD INTERSECTION (GPS 40.115061, -83.356994). MARK THE ENTIRE LENGTH OF THIS SECTION, EXTENDING 40 FT OUT FROM THE SOUTH EDGE OF ASPHALT. SOUTH SIDE ONLY. INCLUDE THE SOUTH SIDE OF THE SR 161 / DEBOLT RD INTERSECTION.
JOB 1603E. SR 161 SOUTH, SECTION 6 OF 6, APPROX. 511 FT, ENDING AT DEBOLT RD. NEW ROUT. OHIO811 RESPONSE DEADLINE: 10/27/2026 11:59 PM ET. PLAIN-TEXT CONFIRMATION START BY: 11/06/2026; PORTAL/HTML START BY: 11/08/2026 11:59 PM ET. POSITIVE RESPONSES PENDING. COMMENTS: If possible, could you please complete the marking or provide a clear response as soon as possible? We would really appreciate your help. Thank you.