2629504750
OHrev 000Trabajo 1603ActivoActualizar hoyINSTALL FIBER OPTIC CONDUIT
Última actualización con Ohio 811: 10/22/2026, 9:26:16 PM
- GTOPEsperando
FRONTIER COMM (FORMERLY VERIZON) (USIC)
communication
- CMAPEsperando
MADISON COUNTY ENGINEER
sewer
- OH811Esperando
OUPSTECH - NO +RESPONSE REQUIRED
reclaimed water
- USSSin conflicto
U S SIGNAL COMPANY
001communication
by Dakota Lee · 10/22/2026
START AT THE INTERSECTION OF MARYSVILLE-LONDON RD (SR-38) AND FINLEY GUY RD (CR-123) (GPS 40.060511, -83.407735). LOCATE AND MARK CONTINUOUSLY FOR APPROXIMATELY 2400 FT SOUTH ALONG THE WEST SIDE OF MARYSVILLE-LONDON RD (SR-38), ENDING AT GPS 40.053957, -83.408598. MARK THE ENTIRE LENGTH OF THIS SECTION, EXTENDING 40 FT OUT FROM THE WEST EDGE OF ASPHALT. WEST SIDE ONLY. INCLUDE THE CROSSING OF FINLEY GUY RD WITHIN THE WEST-SIDE WORK CORRIDOR.
Tramo 2 de 1603 / 1603E. Confirmacion Ohio811 2629504750-000, registrada el 22/10/2026 a las 3:20 PM ET. Plazo oficial Work Date: 26/10/2026 11:59 PM ET. Start By: 07/11/2026 11:59 PM ET. El mapa oficial identifica Pike Twp y Monroe Twp. Respuestas de utilities pendientes de verificar; no interpretar 0/0 como clear.