2629504738
OHrev 000Trabajo 1603ActivoActualizar hoyINSTALL FIBER OPTIC CONDUIT
Última actualización con Ohio 811: 10/22/2026, 9:12:15 PM
- GTOPEsperando
FRONTIER COMM (FORMERLY VERIZON) (USIC)
communication
- CMAPEsperando
MADISON COUNTY ENGINEER
sewer
- OEDEsperando
OHIO EDISON - (USIC)
electric
- OH811Esperando
OUPSTECH - NO +RESPONSE REQUIRED
reclaimed water
- USSSin conflicto
U S SIGNAL COMPANY
001communication
No Conflict - Underground facilities operated by this member are not in conflict based on information provided in the Excavation Request.
by Dakota Lee · 10/22/2026
START AT THE INTERSECTION OF MARYSVILLE-LONDON RD (SR-38) AND FINLEY GUY RD (CR-123) (GPS 40.060511, -83.407735). LOCATE AND MARK CONTINUOUSLY FOR APPROXIMATELY 2478 FT NORTH ALONG THE WEST SIDE OF MARYSVILLE-LONDON RD (SR-38), ENDING AT GPS 40.067285, -83.406937. MARK THE ENTIRE LENGTH OF THIS SECTION, EXTENDING 40 FT OUT FROM THE WEST EDGE OF ASPHALT. WEST SIDE ONLY.