2629504283
OHTrabajo 26710021ActivoActualizar hoyINSTALL FIBER OPTIC CONDUIT
- DCOPEsperando
DEL-CO WATER
WATER
- ATSPEsperando
FIRST ENERGY FIBER/USIC
COMMUNICATION
- GTOPEsperando
FRONTIER COMM (FORMERLY VERIZON) (USIC)
COMMUNICATION
- ORPPEsperando
MARATHON PIPE LINE - HEATH
GAS
BEGINNING AT THE INTERSECTION OF N SECTION LINE RD AND PEEL RD (40.416032, -83.115580). LOCATE SOUTH ALONG N SECTION LINE RD APPROXIMATELY 1,710 FEET TO 40.411372, -83.116064. LOCATE BOTH SIDES OF N SECTION LINE RD, INCLUDING THE ROADWAY AND 40 FEET BEYOND EACH EDGE OF PAVEMENT. INCLUDE ALL DRIVEWAY CROSSINGS WITHIN THIS SECTION. INCLUDE THE N SECTION LINE RD / PEEL RD INTERSECTION. THIS ROAD IS ON THE RADNOR / MARLBORO TOWNSHIP LINE; INCLUDE BOTH SIDES.
UPDT ROUT - Reemplaza el ticket 2627806749. Confirmación oficial de Ohio 811 recibida el 10/22/2026. Contacto y solicitante: Jimmy Ventura, 470-860-4504, JA-GA@jaundergroundfacility.com. Work Date: 10/26/2026 23:59:59 ET. Start By: 11/07/2026 23:59:59 ET según la confirmación HTML; es la fecha límite para comenzar, no el vencimiento automático de una excavación ya iniciada. Respuestas de utilidades pendientes de verificar. UPDATE COMMENTS: REPLACES TICKET 2627806749. IF POSSIBLE, COULD ALL NOTIFIED UTILITIES PLEASE PROVIDE THEIR RESPONSE AS SOON AS POSSIBLE? WE WOULD REALLY APPRECIATE YOUR HELP. THANK YOU.